University of Bath: Audio Visual Unit

News and developments in AV

Tagged: GTA

Summer Upgrades

  

📥  Design Build Advise, Equipment, Projects, Spaces

This summer, we are rebuilding many of the teaching spaces.

Full rebuilds (Furniture, Decoration, Equipment):

  • 1E
  • 2E (but not 3.1)
  • 3WN
  • 4E (not 3.38)

Equipment refresh & Decoration:

  • 5W
  • Council Chamber

Equipment Refresh

  • 4W
  • 6W

1E3.6, 4E2.56 and 4E3.5 will become twin projector rooms - so you can show 2 sources side-by-side.

3WN2.1 will be fitted with camera tracking (similar to University Hall).

These rooms are being upgraded to the latest AV Specification. They are also being fully rewired to give the latest standard of cabling.

From the start of the new academic year, all of these rooms will be equipped with a full set of digital interfaces, so any form of laptop can be plugged in.

The rooms will have a full lecture capture interface, so that anything the students see on the projection screens or displays will be captured.

An addition to that, the rooms are also getting Apple and Miracast display sharing devices - so you will be able to present from a tablet or latest model laptop wirelessly.

Please contact us if you would like to know any more details.

Room Update - 2E3.1

  ,

📥  Design Build Advise, Spaces

We've been looking at a problem in 2E3.1 last night, and we've discovered that there is an issue with interference on the signal pathway to the projector.

This seems to be being caused by the dimmer contols on some of the lights, which we've currently disabled.

The AV kit is currently working correctly in the room.

We are currently working with Estates to resolve the issue.