GTA Refurbishment - Open Visits

  ,

📥  Design Build Advise, Projects, Spaces, Systems

This coming Thursday and Friday - we'll be available to guide colleagues around the newly refurbished rooms in 3E and 6E.

Just drop in to see us!

Thursday 14 - 14:00 to 16:00

Meet at 3E Foyer

Meet at 6E Foyer (Outside 6E 2.2)

Friday 15 - 10:00 to 12:00 & 14:00 to 16:00

Meet at 3E Foyer

Meet at 6E Foyer (Outside 6E 2.2)

3E 3.8

6E2.2

 

Tours of the rebuilt GTA Rooms

  ,

📥  Design Build Advise, Spaces

Over the course of the next few days, we're hosting a viewing of the rebuilt GTA rooms over the summer, if anyone would like to come and see them:

Thursday 09.30-10:30 4 East  = Meet in Foyer for: 4E 2.4,2.61,3.10, 3.19, 3.5

Thursday 12.30-13:30 5 West = Meet in Foyer for: 5W 2.1, 2.3

Thursday 15.30-17:00 3 West North  = Meet in Foyer for: 3WN 2.1, 3.7, 3.8

Friday 10.30-11:30 1 East = Drop into 1E 2.4 or 1E 3.9

 

GTA Refurbishment - Update 22 July 2016

  , ,

📥  Design Build Advise, Spaces

Work is gathering pace this week, with many of the teaching spaces starting to come back together.

4W and 6W have had a technology change, and will be released back into general usage shortly.

5W 2.1 and 2.3 have been repainted, pending some new AV equipment in the next week or two.

The progress on the other rooms is below!

3WN 2.1 on 22 July - starting to look like a theatre again.

3WN 2.1 on 22 July - starting to look like a theatre again.

 

3WN3.8 - please note the new windows.

3WN3.8 - please note the new windows.

 

4E3.10 - New flooring & Paintwork

4E3.10 - New flooring & Paintwork

 

4E2.61

4E2.61

 

4E2.56

4E2.56

 

1E3.9 PC Lab

1E3.9 PC Lab

 

1E3.6

1E3.6

 

 

 

GTA Refurbishment - Summer Update #1

  , ,

📥  Design Build Advise, Spaces

We thought we'd let you have an insight into the work that is going on behind the scenes in some of the GTA spaces over this summer's build project.

As you can see, we're not just updating the technology (which we are doing), but we're preparing the rooms for a full set of infrastructure for the future years. This includes the furniture, the infrastructure cabling, wiring, lights (in some places) and teaching stations.

We're all very busy!

1E2.4 - Stripped Out

1E2.4 - Stripped Out

1E3.6 waiting for attention

1E3.6 waiting for attention

This was a PC Lab!

This was a PC Lab!

3WN2.1 - Empty

3WN2.1 - Empty

3WN2.1

3WN2.1 Flooring change

3WN3.7

3WN3.7 Stripped to the floor

3WN3.7_2016rebuild_1

3WN3.7 - The boards are being replaced with something new

3WN3.8

New windows for 3WN3.8

4E3.10

4E3.10 Asbestos removal from Windows and Wall

 

GTA Refurbishment

  ,

📥  Design Build Advise, Spaces

The GTA refurbishment is going along at quite a pace.

The bulk of the work so far has been spent in dealing with the asbestos works in 1E, 2E and 4E.

Many of the other rooms are also starting to be redecorated.

4E3.10

4E3.10

4E3.10_1

4E3.10_cabling

The full list of what we're doing is here:

Summer Upgrades

Please contact us if you'd like to know any more.