Campus travel updates

Updates for everyone travelling to the University of Bath

Topic: Travel Update

Changes to Swindon, Bristol, Didcot Parkway and Chippenham rail services: 27-29 May and 10-11 June

  , ,

📥  Public transport, Travel Update

Network Rail will be undertaking work in the Swindon area to prepare for their new trains which enter service later this year. As a result of this, train services through Didcot Parkway, Swindon, Chippenham and Bristol Parkway will be amended.

High speed services between London, Bristol and South Wales will be diverted and rail replacement buses will replace trains on routes through Swindon.

More information can be found here

 

Bath Spa train station weekend closures 8-9, 14-17 & 22-23 April

📥  Public transport, Travel Update

This Easter (8-23 April) Network Rail will be undertaking rail improvement work in the Bath area  impacting on the ability of GWR to operate the usual train service.

Network Rail will widen the platforms at Bath as part of the ongoing infrastructure works linked to the introduction of GWR’s new IET trains and electrification.

On the weekends of 8-9, 14-17 and 22-23 April Bath Spa will be closed.

There will be no trains between Bristol and Bath, Chippenham and Bath or Trowbridge and Bath.

Throughout the weekends buses will replace trains between Bath and Chippenham, Bristol, Bradford on Avon, Trowbridge, Westbury and Frome. Stopping buses will serve Freshford and Westwood (for Avoncliff), Oldfield Park and Keynsham. A Castle Cary to Bristol service will also run to connect in/out of Weymouth line services which start/terminate at Westbury.

During the working week (April 10-13 and 18-21) only one platform will be available to run trains so a revised train service will operate with trains between Bristol Temple Meads and London Paddington via Bath and Chippenham will operating every hour.

Great Western Railway urge all customers to check travel arrangements by visiting www.gwr.com/Bath2017 and consider travelling on the Fridays and Mondays.

Information is available at all stations and on all journey planners.

 

Towpath closed between Green Park and Churchill Bridge

📥  Planned road works, Travel Update, Uncategorized

Works to create the new south facing riverside park as part of the Bath Quays Waterside Project are now over halfway complete.

In order to create the lower promenade, and widen the existing towpath between Green Park and Churchill Bridge, the towpath will need to be closed from Monday 9 January for the remainder of the north bank works. Boat moorings will still be accessible, with pedestrians and cyclists signposted to divert via Ambury, Corn Street, Green Park Road and Green Park cycle path – see diversion plan below.

banes-towpath-diversion-map-jan2017-web

The widened river bank is designed to accommodate the flow of flood waters, and so once open to the public, access to the bank will be restricted during flood events.

Construction updates will continue to be posted regularly on the project webpage.

 

South car park closure: Wed 11 Jan

📥  Car parking on campus, Travel Update

Due to the commencement of building works for the Milner Building the rear of B, South, car park will be cordoned off on Wednesday 11 January.

The area affected is shown below and will be out of bounds for the construction project which is due to run until April 2018.

Please remove all vehicles from this area before Wednesday night.

south-car-park

 

Christmas closure at Paddington Station

  , , , ,

📥  Public transport, Travel Update

To allow for electrification and Crossrail works Paddington Station will be closed over Christmas.

There will be a six-day closure, starting on Christmas Eve, Saturday December 24 through to Thursday 29 December.

Trains are likely to be very busy on Friday 23 December, and it is recommended that customers book ahead and travel early if they can.

Trains will start and finish at Ealing Broadway throughout the closure with customers completing their journey by London Underground.  There are no lifts at the station and it is recommended that customers who find using Ealing Broadway difficult, to change trains at Reading and travel to and from London Waterloo.  South West Trains have agreed to accept GWR tickets to support this.

Full details are available here including details on travelling with bikes, sleeper services and Pullman dining service.

 

Temporary loss of motorcycle parking - 6-16 Dec

  , , ,

📥  Travel Update, Uncategorized

As from 10.00pm on Tuesday 6 December vehicles travelling along the underdeck from East to West will have a slight diversion in order to exit the underdeck.

The area which will be cordoned off for repair works will impact on the motorcycle parking next to the electric charger sockets (left photo below), which will be suspended for the duration of the works. Due to the diversion route the motorcycle parking area (right photo below) will also be suspended.

There is temporary parking for motorcycles opposite the west doors to 4ES.

photo-1-underdeck-motorcycle-parking photo-2-underdeck-motorcycle-parking

 

Travel update

  

📥  Cycling, Planned road works, Public transport, Road closures, Travel Update

Our latest travel update looking at the weeks ahead:

Ongoing:

If you know of any travel disruption please email comms@bath.ac.uk and we will include it in the blog.