{"id":122,"date":"2016-01-14T16:20:24","date_gmt":"2016-01-14T16:20:24","guid":{"rendered":"http:\/\/blogs.bath.ac.uk\/new-builds\/?p=122"},"modified":"2016-01-15T12:10:49","modified_gmt":"2016-01-15T12:10:49","slug":"4-east-south-project-update-5","status":"publish","type":"post","link":"https:\/\/blogs.bath.ac.uk\/new-builds\/2016\/01\/14\/4-east-south-project-update-5\/","title":{"rendered":"4 East South: Project Update"},"content":{"rendered":"<p>The project has made good progress during December despite a halt in construction over the Christmas period and the recent bad weather conditions:<\/p>\n<ul>\n<li>Screeding (levelled concrete flooring) has been completed on level 4.<\/li>\n<li>The underfloor heating system has been installed.<\/li>\n<li>Installation of paving slabs on the West core roof has been completed.<\/li>\n<li>Over 90% of the building\u2019s windows have been installed.<\/li>\n<li>East core has been fully insulated.<\/li>\n<li>Installation of radiators has begun\u00a0on Levels 2 and 3 in the West core.<\/li>\n<\/ul>\n<figure id=\"attachment_123\" aria-describedby=\"caption-attachment-123\" style=\"width: 912px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/01\/4es-Jan-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-123\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/01\/4es-Jan-1.jpg\" alt=\"South elevation\" width=\"912\" height=\"513\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/01\/4es-Jan-1.jpg 912w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/01\/4es-Jan-1-300x169.jpg 300w\" sizes=\"auto, (max-width: 912px) 100vw, 912px\" \/><\/a><figcaption id=\"caption-attachment-123\" class=\"wp-caption-text\">South elevation<\/figcaption><\/figure>\n<figure id=\"attachment_126\" aria-describedby=\"caption-attachment-126\" style=\"width: 2048px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/01\/Untitled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-126 size-full\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/01\/Untitled.jpg\" alt=\"Internal\" width=\"2048\" height=\"1152\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/01\/Untitled.jpg 2048w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/01\/Untitled-300x169.jpg 300w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/01\/Untitled-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/><\/a><figcaption id=\"caption-attachment-126\" class=\"wp-caption-text\">Internal progress<\/figcaption><\/figure>\n<p><strong>Health &amp; Safety<\/strong><\/p>\n<p>There have been no injuries or accidents on site.<\/p>\n<p>The site has achieved a 98% score in the recent health and safety compliance audit. The team has never scored lower than 97%.<\/p>\n<p><strong>Did you know...?<\/strong><\/p>\n<p>To date over 170 tons of reinforced steel has been used in the structure, the equivalent weight of a fully\u00a0grown Blue Whale.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project has made good progress during December despite a halt in construction over the Christmas period and the recent bad weather conditions: Screeding (levelled concrete flooring) has been completed on level 4. The underfloor heating system has been installed....<\/p>\n","protected":false},"author":620,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[7],"tags":[2,3,16],"class_list":["post-122","post","type-post","status-publish","format-standard","hentry","category-4-east-south","tag-4-east-south","tag-4es","tag-project-update"],"acf":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/users\/620"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/comments?post=122"}],"version-history":[{"count":0,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/122\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/media?parent=122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/categories?post=122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/tags?post=122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}