{"id":137,"date":"2016-02-01T15:37:46","date_gmt":"2016-02-01T15:37:46","guid":{"rendered":"http:\/\/blogs.bath.ac.uk\/new-builds\/?p=137"},"modified":"2016-02-01T16:07:44","modified_gmt":"2016-02-01T16:07:44","slug":"10-west-project-update-6","status":"publish","type":"post","link":"https:\/\/blogs.bath.ac.uk\/new-builds\/2016\/02\/01\/10-west-project-update-6\/","title":{"rendered":"10 West: Project Update"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-138 size-large\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/02\/10-w-feb-e1454342739482-1024x510.jpg\" alt=\"10 w feb\" width=\"1024\" height=\"510\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/02\/10-w-feb-e1454342739482-1024x510.jpg 1024w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/02\/10-w-feb-e1454342739482-300x150.jpg 300w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/02\/10-w-feb-e1454342739482.jpg 1607w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>The project remains on schedule despite the winter weather conditions:<\/p>\n<ul>\n<li>Work on the building\u2019s fa\u00e7ade is progressing well and the installation of the final composite tiles is nearly finished.<\/li>\n<li>Internal works continue to make good progress with the installation of glazed decorative screens.<\/li>\n<li>Floor finishings to wet areas are\u00a0nearly finished.<\/li>\n<li>Final fix carpentry is\u00a0nearly finished.<\/li>\n<li>Final finishings to the main entrance and Atrium staircase\u00a0have begun.<\/li>\n<li>Installation of glass balustrades in the Atrium has been completed.<\/li>\n<li>Access scaffolding in the atrium\u00a0is being removed to allow the final works on the floor to begin.<\/li>\n<li>Structural work on the main entrance and podium walkway has been completed.<\/li>\n<li>Installation of the steel framed walkway to the Podium will begin\u00a0in early February.<\/li>\n<li>Landscaping work has begun\u00a0and the connection to the 8 West ramp is\u00a0nearly finished.<\/li>\n<li>The site team\u2019s office will be removed in March so that major landscaping works can begin, and a smaller temporary office will be installed.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Health and Safety<\/strong><\/p>\n<p>There have been no injuries or accidents on site, reviews continue to ensure a safe environment for the site team and pedestrians.<\/p>\n<p><strong>Noise<\/strong><\/p>\n<p>The noise levels will continue to be the same as previous months.<\/p>\n<p><strong>Did you know\u2026<\/strong><\/p>\n<p>Since the start of the construction project the site team has used over 207,200 tea bags, 22.5kg of coffee and 171kg of sugar.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project remains on schedule despite the winter weather conditions: Work on the building\u2019s fa\u00e7ade is progressing well and the installation of the final composite tiles is nearly finished. Internal works continue to make good progress with the installation of...<\/p>\n","protected":false},"author":620,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[8],"tags":[5,6,16],"class_list":["post-137","post","type-post","status-publish","format-standard","hentry","category-10-west","tag-10-west","tag-10w","tag-project-update"],"acf":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/137","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/users\/620"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/comments?post=137"}],"version-history":[{"count":0,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/137\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/media?parent=137"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/categories?post=137"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/tags?post=137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}