{"id":194,"date":"2016-10-24T09:59:21","date_gmt":"2016-10-24T09:59:21","guid":{"rendered":"http:\/\/blogs.bath.ac.uk\/new-builds\/?p=194"},"modified":"2016-10-24T10:00:00","modified_gmt":"2016-10-24T10:00:00","slug":"18-manvers-street-project-update-2","status":"publish","type":"post","link":"https:\/\/blogs.bath.ac.uk\/new-builds\/2016\/10\/24\/18-manvers-street-project-update-2\/","title":{"rendered":"18 Manvers Street project update"},"content":{"rendered":"<p>The refurbishment works continue to progress well.<\/p>\n<ul>\n<li>Level 1 floor screed has been laid and partition works are ongoing.<\/li>\n<li>Level 1 inner courtyard walls have been built and initial fitting of Mechanical and Electrical (M&amp;E) installations are progressing well.<\/li>\n<li>Lift shaft cladding is progressing and stonework starts next week.<\/li>\n<li>Level 2 initial fixing of cables and pipework are complete.<\/li>\n<li>Plastering works to walls on level 2 are almost complete and carpentry works, including fitting of doors and frames, are progressing well.<\/li>\n<li>New ceilings and final fixing of cables, power outlets, lighting and heating systems will start next week on level 2.<\/li>\n<li>Levels 3 and 4 alteration works are progressing well.<\/li>\n<li>The recent power and water shutdowns took place successfully to help minimise disruption to University staff on Level 4.<\/li>\n<li>Level 3 is being prepared for temporary staff moves for the payroll team from end of October.<\/li>\n<li>Works to the forecourt will progress, including insulation and waterproofing works.<\/li>\n<li>Re-cabling of the data services for Level 2 will start soon.<\/li>\n<li>Installation of the new air handling unit is planned.<\/li>\n<\/ul>\n<p>Noise and dust levels are continually monitored.\u00a0Please feel free to contact Dribuild Site Manager, Tom Young, on 07843 980398 with any queries.<\/p>\n<div id='gallery-1' class='gallery galleryid-194 gallery-columns-2 gallery-size-medium'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/blogs.bath.ac.uk\/new-builds\/2016\/10\/24\/18-manvers-street-project-update-2\/1-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"225\" height=\"300\" src=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/10\/1-225x300.jpg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/10\/1-225x300.jpg 225w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/10\/1.jpg 488w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/blogs.bath.ac.uk\/new-builds\/2016\/10\/24\/18-manvers-street-project-update-2\/2-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"225\" height=\"300\" src=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/10\/2-225x300.jpg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/10\/2-225x300.jpg 225w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/10\/2.jpg 510w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/blogs.bath.ac.uk\/new-builds\/2016\/10\/24\/18-manvers-street-project-update-2\/attachment\/3\/'><img loading=\"lazy\" decoding=\"async\" width=\"225\" height=\"300\" src=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/10\/3-225x300.jpg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/10\/3-225x300.jpg 225w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/10\/3.jpg 518w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/blogs.bath.ac.uk\/new-builds\/2016\/10\/24\/18-manvers-street-project-update-2\/attachment\/4\/'><img loading=\"lazy\" decoding=\"async\" width=\"225\" height=\"300\" src=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/10\/4-225x300.jpg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/10\/4-225x300.jpg 225w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/10\/4.jpg 508w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>The refurbishment works continue to progress well. Level 1 floor screed has been laid and partition works are ongoing. Level 1 inner courtyard walls have been built and initial fitting of Mechanical and Electrical (M&amp;E) installations are progressing well. Lift...<\/p>\n","protected":false},"author":620,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[25],"tags":[26,16],"class_list":["post-194","post","type-post","status-publish","format-standard","hentry","category-manvers-street","tag-manvers-street","tag-project-update"],"acf":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/194","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/users\/620"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/comments?post=194"}],"version-history":[{"count":0,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/194\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/media?parent=194"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/categories?post=194"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/tags?post=194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}