{"id":200,"date":"2016-11-16T08:40:12","date_gmt":"2016-11-16T08:40:12","guid":{"rendered":"http:\/\/blogs.bath.ac.uk\/new-builds\/?p=200"},"modified":"2016-11-16T08:45:21","modified_gmt":"2016-11-16T08:45:21","slug":"manvers-street-project-update","status":"publish","type":"post","link":"https:\/\/blogs.bath.ac.uk\/new-builds\/2016\/11\/16\/manvers-street-project-update\/","title":{"rendered":"Manvers Street Project Update"},"content":{"rendered":"<p><span style=\"text-decoration: underline\"><strong>External works<\/strong><\/span><\/p>\n<ul>\n<li>Window replacements are progressing well on Levels 2 and 3.<\/li>\n<li>Concrete panels and glazing to the front elevation have been removed and will be replaced with curtain wall glazing.<\/li>\n<li>Bath Stone cladding is progressing to the new lift shaft on the South elevation and is due to be completed this week.<\/li>\n<li>The front courtyard waterproofing and tanking works are progressing.<\/li>\n<li>Roofing works are complete and the new air handling unit will be lifting onto the roof with a mobile crane.<\/li>\n<\/ul>\n<p>Access routes across the site are maintained for the University staff working on Level 4.\u00a0 The access routes will be amended as the works progress.<br \/>\n<span style=\"text-decoration: underline\"><strong>Internal works<\/strong><\/span><\/p>\n<p><strong>Level 1<\/strong><\/p>\n<ul>\n<li>Internal tanking and waterproofing works are complete.<\/li>\n<li>Mechanical, Electrical and Carpentry works are progressing well.<\/li>\n<li>Plasterboarding is ongoing and plastering will follow.<\/li>\n<\/ul>\n<p><strong>Level 2<\/strong><\/p>\n<ul>\n<li>Mechanical, Electrical and Carpentry works are progressing well.<\/li>\n<li>Decorations and finishes works have commenced.<\/li>\n<\/ul>\n<p><strong>Level 3<\/strong><\/p>\n<ul>\n<li>The toilet refurbishments are complete and handed over for use by occupants.<\/li>\n<li>The staff have now been relocated from the South end of Level 4 onto Level 3 in preparation for the lift shaft breakthroughs.<\/li>\n<\/ul>\n<p>All works on Level 3 will be completed by the end of November.<\/p>\n<div id='gallery-1' class='gallery galleryid-200 gallery-columns-3 gallery-size-medium'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/11\/IMG_1348.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"225\" height=\"300\" src=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/11\/IMG_1348-225x300.jpg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/11\/IMG_1348-225x300.jpg 225w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/11\/IMG_1348-768x1024.jpg 768w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/11\/IMG_1350.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"225\" height=\"300\" src=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/11\/IMG_1350-225x300.jpg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/11\/IMG_1350-225x300.jpg 225w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/11\/IMG_1350-768x1024.jpg 768w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/11\/IMG_1362.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"225\" height=\"300\" src=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/11\/IMG_1362-225x300.jpg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/11\/IMG_1362-225x300.jpg 225w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2016\/11\/IMG_1362-768x1024.jpg 768w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>External works Window replacements are progressing well on Levels 2 and 3. Concrete panels and glazing to the front elevation have been removed and will be replaced with curtain wall glazing. Bath Stone cladding is progressing to the new lift...<\/p>\n","protected":false},"author":620,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[25],"tags":[26,16],"class_list":["post-200","post","type-post","status-publish","format-standard","hentry","category-manvers-street","tag-manvers-street","tag-project-update"],"acf":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/200","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/users\/620"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/comments?post=200"}],"version-history":[{"count":0,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/200\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/media?parent=200"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/categories?post=200"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/tags?post=200"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}