{"id":271,"date":"2017-02-28T11:05:15","date_gmt":"2017-02-28T11:05:15","guid":{"rendered":"http:\/\/blogs.bath.ac.uk\/new-builds\/?p=271"},"modified":"2017-03-03T14:12:45","modified_gmt":"2017-03-03T14:12:45","slug":"the-milner-centre-for-evolution-update","status":"publish","type":"post","link":"https:\/\/blogs.bath.ac.uk\/new-builds\/2017\/02\/28\/the-milner-centre-for-evolution-update\/","title":{"rendered":"The Milner Centre for Evolution update"},"content":{"rendered":"<p>Our aim is to keep all staff and students working within close proximity of the project up-to-date and informed of works progress. Where possible WRW will give notice of any potential disruption. Site Manager, Firhan Saeed, will be on site throughout the working day and will be the first point of contact (07976 865497 or <a href=\"mailto:frs547@wrw.co.uk\">frs547@wrw.co.uk<\/a>).<\/p>\n<p>The contractor's welfare &amp; office area has been installed and a secure boundary to the perimeter of the site has been erected.\u00a0Additional signage to the perimeter \u00a0- to identify who we are, the site contact details and giving directions for pedestrians - is being displayed.<\/p>\n<p>The site works have included stripping topsoil and we are in the process of excavating the ground to lower levels to install foundations and drainage up to 3m in depth. The ground is largely rock and consequently there will be some noisy works removing this. The noise &amp; vibration will be intermittent throughout the working day over the next four to six weeks. The excavated material will then be removed from site by haulage lorries - during this time we will be monitoring road conditions to ensure they are kept clean.<\/p>\n<p>We will also be installing a new water connection to Building 4SA within the next two weeks and excavating an electricity trench from the site to the substation opposite the car park.<\/p>\n<table style=\"height: 360px\" width=\"576\">\n<tbody>\n<tr>\n<td style=\"text-align: center\" width=\"304\"><strong>Forecast works over the next few weeks<\/strong><\/td>\n<td style=\"text-align: center\" width=\"161\"><strong>Noise level<\/strong><\/td>\n<td style=\"text-align: center\" width=\"217\"><strong>Forecast completion date<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"304\">\n<ul>\n<li>Breaking out rock in ground to form foundations and drainage<\/li>\n<\/ul>\n<\/td>\n<td style=\"text-align: center\" width=\"161\">Possible disruption throughout the day<\/td>\n<td style=\"text-align: center\" width=\"217\">Until the end of March<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"304\">\n<ul>\n<li>Excavations being removed from site, by haulage company<\/li>\n<\/ul>\n<\/td>\n<td style=\"text-align: center\" width=\"161\">Occasional plant noise<\/td>\n<td style=\"text-align: center\" width=\"217\">Throughout March<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"304\">\n<ul>\n<li>Concrete deliveries<\/li>\n<\/ul>\n<\/td>\n<td style=\"text-align: center\" width=\"161\">Occasional plant noise<\/td>\n<td style=\"text-align: center\" width=\"217\">Throughout March &amp; April<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\" width=\"304\">\n<ul>\n<li>General deliveries<\/li>\n<\/ul>\n<\/td>\n<td style=\"text-align: center\" width=\"161\">Occasional plant noise<\/td>\n<td style=\"text-align: center\" width=\"217\">Throughout March &amp; April<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div id='gallery-1' class='gallery galleryid-271 gallery-columns-2 gallery-size-large'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/blogs.bath.ac.uk\/new-builds\/2017\/02\/28\/the-milner-centre-for-evolution-update\/3-milner-update\/'><img loading=\"lazy\" decoding=\"async\" width=\"685\" height=\"385\" src=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/02\/3-Milner-Update.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/02\/3-Milner-Update.jpg 685w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/02\/3-Milner-Update-300x169.jpg 300w\" sizes=\"auto, (max-width: 685px) 100vw, 685px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/blogs.bath.ac.uk\/new-builds\/2017\/02\/28\/the-milner-centre-for-evolution-update\/2-milner-update\/'><img loading=\"lazy\" decoding=\"async\" width=\"677\" height=\"381\" src=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/02\/2-Milner-Update.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/02\/2-Milner-Update.jpg 677w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/02\/2-Milner-Update-300x169.jpg 300w\" sizes=\"auto, (max-width: 677px) 100vw, 677px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n<p>Current site, Feb 2017<\/p>\n<p><a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/02\/Milner-Update.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-274 size-large\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/02\/Milner-Update-e1488278474169-1024x686.jpg\" alt=\"Milner Update\" width=\"1024\" height=\"686\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/02\/Milner-Update-e1488278474169-1024x686.jpg 1024w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/02\/Milner-Update-e1488278474169-300x201.jpg 300w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/02\/Milner-Update-e1488278474169-768x514.jpg 768w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/02\/Milner-Update-e1488278474169.jpg 1581w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p>How it will look in April 2018<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Our aim is to keep all staff and students working within close proximity of the project up-to-date and informed of works progress. Where possible WRW will give notice of any potential disruption. Site Manager, Firhan Saeed, will be on site...<\/p>\n","protected":false},"author":904,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[31],"tags":[],"class_list":["post-271","post","type-post","status-publish","format-standard","hentry","category-milner-centre"],"acf":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/271","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/users\/904"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/comments?post=271"}],"version-history":[{"count":0,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/271\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/media?parent=271"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/categories?post=271"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/tags?post=271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}