{"id":371,"date":"2017-11-09T12:23:45","date_gmt":"2017-11-09T12:23:45","guid":{"rendered":"http:\/\/blogs.bath.ac.uk\/new-builds\/?p=371"},"modified":"2017-11-09T12:23:45","modified_gmt":"2017-11-09T12:23:45","slug":"polden-development-update-4","status":"publish","type":"post","link":"https:\/\/blogs.bath.ac.uk\/new-builds\/2017\/11\/09\/polden-development-update-4\/","title":{"rendered":"Polden development update"},"content":{"rendered":"<p>Welcome to the tenth monthly update with news to keep you informed on the new Polden Student Accommodation project.<\/p>\n<p>October has been yet another very busy month, with the main frame to the block closest to the West Car Park entrance complete and the fit-out underway.<\/p>\n<p>The concrete frames to the remaining blocks continue to progress at pace with most of the concrete frame works planned to be complete by Christmas.\u00a0 The construction team continue to liaise with all relevant university departments on all deliveries expected on the campus to minimise disruption as much as possible.<\/p>\n<p>The appearance of the first and second buildings is now changing on a daily basis; with the weather defence board being fixed and widows now being installed also.<\/p>\n<p>Internally many of the bedrooms in the first block have been formed with the bathroom pods now in position. The mechanical and electrical installation is also now underway.<\/p>\n<p>The forthcoming month will be busier still, with construction of the second concrete frame nearing completion and the main external fa\u00e7ade works to enclose the structure commencing.\u00a0 This will further enable the team to progress with the internal fit-out trades.<\/p>\n<p>We appreciate all your patience and understanding whilst the construction work is ongoing, with contractors working closely with the University Estates, AHS, and Security teams to minimise disruption as much as possible.<\/p>\n<p><strong>Current site<\/strong><\/p>\n<p><a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/11\/Polden-Nov-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-372\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/11\/Polden-Nov-2.jpg\" alt=\"\" width=\"333\" height=\"250\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/11\/Polden-Nov-2.jpg 690w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/11\/Polden-Nov-2-300x225.jpg 300w\" sizes=\"auto, (max-width: 333px) 100vw, 333px\" \/><\/a> <a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/11\/Polden-Nov-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-373\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/11\/Polden-Nov-1.jpg\" alt=\"\" width=\"334\" height=\"250\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/11\/Polden-Nov-1.jpg 673w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/11\/Polden-Nov-1-300x225.jpg 300w\" sizes=\"auto, (max-width: 334px) 100vw, 334px\" \/><\/a><\/p>\n<p><a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/11\/Polden-November-update.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-374\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/11\/Polden-November-update.jpg\" alt=\"\" width=\"628\" height=\"155\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/11\/Polden-November-update.jpg 628w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2017\/11\/Polden-November-update-300x74.jpg 300w\" sizes=\"auto, (max-width: 628px) 100vw, 628px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Welcome to the tenth monthly update with news to keep you informed on the new Polden Student Accommodation project. October has been yet another very busy month, with the main frame to the block closest to the West Car Park...<\/p>\n","protected":false},"author":961,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[1],"tags":[],"class_list":["post-371","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"acf":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/371","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/users\/961"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/comments?post=371"}],"version-history":[{"count":0,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/371\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/media?parent=371"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/categories?post=371"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/tags?post=371"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}