{"id":412,"date":"2018-02-14T13:09:25","date_gmt":"2018-02-14T13:09:25","guid":{"rendered":"http:\/\/blogs.bath.ac.uk\/new-builds\/?p=412"},"modified":"2018-02-14T13:09:25","modified_gmt":"2018-02-14T13:09:25","slug":"sport-training-village-gym-extension-february-2018","status":"publish","type":"post","link":"https:\/\/blogs.bath.ac.uk\/new-builds\/2018\/02\/14\/sport-training-village-gym-extension-february-2018\/","title":{"rendered":"Sport Training Village: Gym Extension, February 2018"},"content":{"rendered":"<p>This is the first in a series of monthly updates which will track the construction of the new gym extension and provide an insight into the work going-on behind the scenes to create a high quality sports facility.<\/p>\n<p>The Gym Extension will provide an additional 940m\u00b2 of floor space to the Sports Training Village split across two floors, with enough room to accommodate more than 200 users.<\/p>\n<p><a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/02\/STV-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-414 size-full\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/02\/STV-2.jpg\" alt=\"\" width=\"494\" height=\"195\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/02\/STV-2.jpg 494w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/02\/STV-2-300x118.jpg 300w\" sizes=\"auto, (max-width: 494px) 100vw, 494px\" \/><\/a><\/p>\n<p>The contractor Melhuish &amp; Saunders Ltd (M&amp;S) started construction in November. The initial focus was on the underground infrastructure and creating sufficient working room at the side of the Sports Hall to build a new ramp and stepped access.<\/p>\n<p>Creating a new access point into the Sports Hall early in the programme will free-up the construction site for M&amp;S and enable them to start setting out the foundations and preparing the site for the building\u2019s steel frame.<\/p>\n<p><a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/02\/STV-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-415 size-full\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/02\/STV-1.jpg\" alt=\"\" width=\"560\" height=\"361\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/02\/STV-1.jpg 560w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/02\/STV-1-300x193.jpg 300w\" sizes=\"auto, (max-width: 560px) 100vw, 560px\" \/><\/a><\/p>\n<p>It is anticipated that the steel deliveries will start from 19 February 2018. These will generate some increased traffic which will be coordinated with the neighbouring University facilities of BioMechanics, STV and the Edge Theatre.<\/p>\n<p><a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/02\/STV-FEB.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-413 size-full\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/02\/STV-FEB.png\" alt=\"\" width=\"574\" height=\"169\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/02\/STV-FEB.png 574w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/02\/STV-FEB-300x88.png 300w\" sizes=\"auto, (max-width: 574px) 100vw, 574px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This is the first in a series of monthly updates which will track the construction of the new gym extension and provide an insight into the work going-on behind the scenes to create a high quality sports facility. The Gym...<\/p>\n","protected":false},"author":1042,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[48],"tags":[49],"class_list":["post-412","post","type-post","status-publish","format-standard","hentry","category-stv-gym-extension","tag-gym-extension"],"acf":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/412","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/users\/1042"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/comments?post=412"}],"version-history":[{"count":0,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/412\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/media?parent=412"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/categories?post=412"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/tags?post=412"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}