{"id":471,"date":"2018-06-18T11:05:49","date_gmt":"2018-06-18T11:05:49","guid":{"rendered":"http:\/\/blogs.bath.ac.uk\/new-builds\/?p=471"},"modified":"2018-06-18T11:05:49","modified_gmt":"2018-06-18T11:05:49","slug":"polden-development-update-june-2018","status":"publish","type":"post","link":"https:\/\/blogs.bath.ac.uk\/new-builds\/2018\/06\/18\/polden-development-update-june-2018\/","title":{"rendered":"Polden development update - June 2018"},"content":{"rendered":"<p>The outside of our building is taking shape now, with progress to the stone cladding and other elements of the fa\u00e7ade.\u00a0 We\u2019ve also removed our tower crane from the site, which is allowing us to progress with landscaping works to the rear of the building.<\/p>\n<p>Inside the building, the installation of bedroom furniture and kitchens, along with decorating, joinery and floor laying is continuing.\u00a0 We are applying the final coats of paint to the first bedrooms over the next few weeks.<\/p>\n<p>Behind the scenes, work continues in the plant rooms, comms rooms and service risers that together will ensure that the building operates correctly.<\/p>\n<p>Around the perimter of the building, there will be some disruption over the coming months as the landscaping works continue, to ensure that Polden ties in with the rest of campus.<\/p>\n<p>We will continue to work closely with the University Estates, AHS, and Security teams to minimise this disruption as much as possible as our project continues.<\/p>\n<p><a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/06\/polden-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-472 size-thumbnail\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/06\/polden-1-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a> <a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/06\/polden-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-473 size-thumbnail\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/06\/polden-2-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a> <a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/06\/polden-3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-474 size-thumbnail\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/06\/polden-3-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a> <a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/06\/polden-4.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-475 size-thumbnail\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2018\/06\/polden-4-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a><\/p>\n<table width=\"0\">\n<tbody>\n<tr>\n<td width=\"314\"><strong>Forecast works over the next few weeks<\/strong><\/td>\n<td width=\"167\"><strong>Noise level<\/strong><\/td>\n<td width=\"142\"><strong>Forecast completion date<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"314\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Fixing of Fa\u00e7ade systems<\/td>\n<td width=\"167\"><strong>Cutting and drilling <\/strong><\/td>\n<td width=\"142\">August 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"314\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Use of Mobile Working Platforms for Fa\u00e7ade works<\/td>\n<td width=\"167\"><strong>Occasional plant noise<\/strong><\/td>\n<td width=\"142\">August 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"314\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Material deliveries and distribution<\/td>\n<td width=\"167\"><strong>Occasional plant noise<\/strong><\/td>\n<td width=\"142\">August 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"314\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ground and landscaping works<\/td>\n<td width=\"167\"><strong>Occasional plant noise<\/strong><\/td>\n<td width=\"142\">August 2018<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>The outside of our building is taking shape now, with progress to the stone cladding and other elements of the fa\u00e7ade.\u00a0 We\u2019ve also removed our tower crane from the site, which is allowing us to progress with landscaping works to...<\/p>\n","protected":false},"author":620,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[29,30],"tags":[],"class_list":["post-471","post","type-post","status-publish","format-standard","hentry","category-polden","category-polden-accommodation"],"acf":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/471","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/users\/620"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/comments?post=471"}],"version-history":[{"count":0,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/471\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/media?parent=471"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/categories?post=471"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/tags?post=471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}