{"id":507,"date":"2020-02-21T13:38:37","date_gmt":"2020-02-21T13:38:37","guid":{"rendered":"http:\/\/blogs.bath.ac.uk\/new-builds\/?p=507"},"modified":"2020-02-21T13:38:37","modified_gmt":"2020-02-21T13:38:37","slug":"school-of-management-project-update-february-2020","status":"publish","type":"post","link":"https:\/\/blogs.bath.ac.uk\/new-builds\/2020\/02\/21\/school-of-management-project-update-february-2020\/","title":{"rendered":"School of Management Project Update - February 2020"},"content":{"rendered":"<p>Welcome to the monthly update focused on keeping you up to speed on progress being made on the new School of Management building project.<\/p>\n<p>Since the last <a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/2020\/01\/17\/school-of-management-building-project-update-january-2020\/\">monthly update<\/a>, the team continues to push the assembly of the reinforced concrete frame with a number of successful concrete pours.<\/p>\n<p><strong>East and west wings<\/strong><\/p>\n<p>Core walls have been erected on level zero in the east wing and the team has also progressed the floor slab in the west wing, along with the erection of core walls and columns on level one. These works have enabled them to progress to level two where they have started on the decking required to pour the slab in the knuckle area.<\/p>\n<p><strong>North and east elevation<\/strong><\/p>\n<p>To the north elevation the team has started the main groundworks and completed the level zero external waterproofing. They\u2019ve now started to install the waterproofing membrane around the knuckle area and east elevation. Internally, they are finishing off the first of the waterproofing to basement level which will enable them to start putting the internal structures in place.<\/p>\n<p>In the coming weeks they will also start on the drainage and foundation works to the pavilion area.<\/p>\n<p>Progress is being made on detailed design for the internal fit out of the building and the team on site is expanding with the addition of further subcontractors on board, most recently the ground works, and mechanical and electrical subcontractors.<\/p>\n<p>As always, the School of Management site continues to change on a daily basis and Bouygues continues to work closely with University of Bath to ensure minimal disruption during this period.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-508\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2020\/02\/1-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2020\/02\/1-300x225.jpg 300w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2020\/02\/1-287x215.jpg 287w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2020\/02\/1.jpg 534w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>\u00a0<img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-509\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2020\/02\/2.jpg\" alt=\"\" width=\"492\" height=\"239\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2020\/02\/2.jpg 809w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2020\/02\/2-300x146.jpg 300w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2020\/02\/2-768x373.jpg 768w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2020\/02\/2-443x215.jpg 443w\" sizes=\"auto, (max-width: 492px) 100vw, 492px\" \/><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"274\"><strong>Forecast of works over the next few weeks<\/strong><\/td>\n<td width=\"170\"><strong>Noise Level<\/strong><\/td>\n<td width=\"157\"><strong>Date<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"274\">Material deliveries<\/td>\n<td width=\"170\">Occasional plant noise<\/td>\n<td width=\"157\">Ongoing throughout February<\/td>\n<\/tr>\n<tr>\n<td width=\"274\">RC Frame and groundworks<\/td>\n<td width=\"170\">Occasional plant noise<\/td>\n<td width=\"157\">Ongoing throughout February<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Welcome to the monthly update focused on keeping you up to speed on progress being made on the new School of Management building project. Since the last monthly update, the team continues to push the assembly of the reinforced concrete...<\/p>\n","protected":false},"author":620,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[50],"tags":[],"class_list":["post-507","post","type-post","status-publish","format-standard","hentry","category-school-of-management"],"acf":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/507","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/users\/620"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/comments?post=507"}],"version-history":[{"count":0,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/507\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/media?parent=507"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/categories?post=507"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/tags?post=507"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}