{"id":57,"date":"2015-07-07T12:39:09","date_gmt":"2015-07-07T12:39:09","guid":{"rendered":"http:\/\/blogs.bath.ac.uk\/new-builds\/?p=57"},"modified":"2015-07-07T12:42:29","modified_gmt":"2015-07-07T12:42:29","slug":"10w","status":"publish","type":"post","link":"https:\/\/blogs.bath.ac.uk\/new-builds\/2015\/07\/07\/10w\/","title":{"rendered":"10 West: Project update - July 2015"},"content":{"rendered":"<p><strong>Progress to date <\/strong><\/p>\n<p>The project is on schedule and continues to benefit from the good weather conditions:<\/p>\n<ul>\n<li>Construction of level 4 has been completed; work on level 5 is now underway and good progress is being made.<\/li>\n<li>Internal partitions have commenced up to level 2 and first fix electrics have started on the ground floor.<\/li>\n<li>Construction of the building\u2019s fa\u00e7ade is in progress and will continue for the next few months.<\/li>\n<li>The western element steel frame and floors are completed and staircases will be completed in the next month.<\/li>\n<li>The atrium steel will be installed in the next month encompassing a 18m steel member lift which will form the support to the atrium glazing. This work will be carried out first thing in the morning to prevent disruption.<\/li>\n<\/ul>\n<p>The Office of Policy and Planning continues to consult with the final users of the building, the Department of Psychology, to refine detailed requirements and furniture procurement.<\/p>\n<figure id=\"attachment_58\" aria-describedby=\"caption-attachment-58\" style=\"width: 550px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2015\/07\/10w-jul2015.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-58\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2015\/07\/10w-jul2015.jpg\" alt=\"10 West build \" width=\"550\" height=\"423\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2015\/07\/10w-jul2015.jpg 550w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2015\/07\/10w-jul2015-300x231.jpg 300w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><\/a><figcaption id=\"caption-attachment-58\" class=\"wp-caption-text\">The new 10 West building is on schedule<\/figcaption><\/figure>\n<p><strong>Health and Safety <\/strong><\/p>\n<p>Extra measures and precautions remain in place relating to construction vehicles and movements are monitored to ensure safety standards are maintained. These include measures such as banksmen who are helping vehicles to safely leave the site.<\/p>\n<p>A secondary access to the site has been formed to assist in deliveries and safe movement of vehicles.<\/p>\n<p>There have been no injuries or accidents and the team are achieving exemplary levels of safety.<\/p>\n<p><strong>Noise <\/strong><\/p>\n<p>The noise levels will continue at the same level as they have been in the previous month.<\/p>\n<p><strong>Did you know\u2026? <\/strong><\/p>\n<p>There are daily logistics meetings about the cranes to make sure every slot is filled to maximise their effective use.<\/p>\n<p>General queries can be addressed to <a href=\"mailto:estates-helpdesk@bath.ac.uk\">estates-helpdesk@bath.ac.uk<\/a><\/p>\n<p>Please also see <a href=\"http:\/\/www.bath.ac.uk\/campus-investments\/\">http:\/\/www.bath.ac.uk\/campus-investments\/<\/a> and <a href=\"http:\/\/www.bath.ac.uk\/estates\/\">http:\/\/www.bath.ac.uk\/estates\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Progress to date The project is on schedule and continues to benefit from the good weather conditions: Construction of level 4 has been completed; work on level 5 is now underway and good progress is being made. Internal partitions have...<\/p>\n","protected":false},"author":472,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[8],"tags":[5,6,4],"class_list":["post-57","post","type-post","status-publish","format-standard","hentry","category-10-west","tag-10-west","tag-10w","tag-project-newsletter"],"acf":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/57","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/users\/472"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/comments?post=57"}],"version-history":[{"count":0,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/57\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/media?parent=57"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/categories?post=57"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/tags?post=57"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}