{"id":94,"date":"2015-10-14T12:12:10","date_gmt":"2015-10-14T12:12:10","guid":{"rendered":"http:\/\/blogs.bath.ac.uk\/new-builds\/?p=94"},"modified":"2015-10-15T10:30:33","modified_gmt":"2015-10-15T10:30:33","slug":"4-east-south-project-update-2","status":"publish","type":"post","link":"https:\/\/blogs.bath.ac.uk\/new-builds\/2015\/10\/14\/4-east-south-project-update-2\/","title":{"rendered":"4 East South: Project update"},"content":{"rendered":"<p><strong>Progress to date<\/strong><\/p>\n<p>September was been a busy month:<\/p>\n<ul>\n<li>The second double height level has been completed.<\/li>\n<li>The reinforced concrete frame has been completed up to Level 6.<\/li>\n<li>The erection of cladding between levels 2 and 4 has begun.<\/li>\n<li>Construction of parapets on the roof is underway.<\/li>\n<li>Painting contractors have finished work on the Level 5 soffits, which has allowed for the mechanical and electrical subcontractors to begin\u00a0work on the floor.<\/li>\n<li>The site team has begun installing the internal partition walls on Level 2.<\/li>\n<\/ul>\n<figure id=\"attachment_95\" aria-describedby=\"caption-attachment-95\" style=\"width: 1000px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-95 size-full\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2015\/10\/4es-2.jpg\" alt=\"\" width=\"1000\" height=\"563\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2015\/10\/4es-2.jpg 1000w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2015\/10\/4es-2-300x169.jpg 300w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><figcaption id=\"caption-attachment-95\" class=\"wp-caption-text\">Internal partitions on Level 2<\/figcaption><\/figure>\n<figure id=\"attachment_96\" aria-describedby=\"caption-attachment-96\" style=\"width: 1000px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-96 size-full\" src=\"http:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2015\/10\/4ES-1.jpg\" alt=\"\" width=\"1000\" height=\"563\" srcset=\"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2015\/10\/4ES-1.jpg 1000w, https:\/\/blogs.bath.ac.uk\/new-builds\/wp-content\/uploads\/sites\/94\/2015\/10\/4ES-1-300x169.jpg 300w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><figcaption id=\"caption-attachment-96\" class=\"wp-caption-text\">Soffits on Level 5<\/figcaption><\/figure>\n<p><strong>Health &amp; Safety<\/strong><\/p>\n<p>Zero accidents on site.<\/p>\n<p><strong>Did you know...?<\/strong><\/p>\n<p>The site has been audited by the Considerate Constructor Scheme and has achieved the excellent score of 43.<\/p>\n<p>The Considerate Constructor Scheme is a non-profit organization, it was founded in 1997 to improve the outward appearance of the construction industry to the public.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Progress to date September was been a busy month: The second double height level has been completed. The reinforced concrete frame has been completed up to Level 6. The erection of cladding between levels 2 and 4 has begun. Construction...<\/p>\n","protected":false},"author":620,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[7],"tags":[2,3],"class_list":["post-94","post","type-post","status-publish","format-standard","hentry","category-4-east-south","tag-4-east-south","tag-4es"],"acf":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/94","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/users\/620"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/comments?post=94"}],"version-history":[{"count":0,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/posts\/94\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/media?parent=94"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/categories?post=94"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.bath.ac.uk\/new-builds\/wp-json\/wp\/v2\/tags?post=94"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}