A concrete pump will be situated in the road outside 2 South between approximately 7am and 1pm on Thursday 17 September 2015 to facilitate building works in the area.
The road running alongside 1 South/3 South and the parking facilities beyond will be closed during these times.
The following parking will be suspended:
· two accessible spaces adjacent to 1 South
· one reserved space, one visitor space, one accessible space and the motorcycle parking area in the small car park at the rear of 4 West.
Pedestrian routes will be maintained and vehicle access to all South Zone car parks (including D Car Park) will be unaffected.