Christmas Break Maintenance

Posted in: News, Spaces

There have been some maintenance activities happening all over campus during this Christmas break.

UniHall has been reprogrammed to address some of the programming quirks.

8W1.28 has had some issues with the feet on the work tables. 2 have been changed to a stronger design, with the remaining stations to be changed in the near future.

8W1_28_Feet

4S Biology labs are being upgraded to multiple displays.

1WN3.24 has been reinstalled to closer resemble all of the other GTA spaces.

Posted in: News, Spaces

Respond

  • (we won't publish this)

Write a response