We thought we'd let you have an insight into the work that is going on behind the scenes in some of the GTA spaces over this summer's build project.

As you can see, we're not just updating the technology (which we are doing), but we're preparing the rooms for a full set of infrastructure for the future years. This includes the furniture, the infrastructure cabling, wiring, lights (in some places) and teaching stations.

We're all very busy!

1E2.4 - Stripped Out
1E2.4 - Stripped Out
1E3.6 waiting for attention
1E3.6 waiting for attention
This was a PC Lab!
This was a PC Lab!
3WN2.1 - Empty
3WN2.1 - Empty
3WN2.1
3WN2.1 Flooring change
3WN3.7
3WN3.7 Stripped to the floor
3WN3.7_2016rebuild_1
3WN3.7 - The boards are being replaced with something new
3WN3.8
New windows for 3WN3.8
4E3.10
4E3.10 Asbestos removal from Windows and Wall