Sophie Madison
-
Sophie MadisonSeptember 23, 2016
18 Manvers Street project update
We are pleased to report that refurbishment works are progressing well: Refurbishment works continue to progress well on Levels 1 and 2. The structural steel frame for the new lift shaft to the Southern end of the building has been...
-
Sophie MadisonAugust 9, 2016
18 Manvers Street project update
We are pleased to report that refurbishment works are progressing well: The front forecourt hoarding has been constructed. Level 1 drainage works are progressing well, and most of the concrete floor slab breaking out process has now been completed. Piling...
-
Sophie MadisonJuly 19, 2016
18 Manvers Street project update
Work has now started on transforming the former police station into a new student learning zone and provide a city centre location for student-facing services. The contractor Dribuild has erected hoardings around the building and work on the front forecourt...
-
Sophie MadisonJune 22, 2016
10W construction time lapse videos
The construction of 10W has been completed, providing a fantastic modern space to house the Psychology labs, IPR offices and the brand new postgraduate learning zone. Below are two time-lapse videos showing the construction from start to finish. https://youtu.be/aTxR3DWlF-o https://www.youtube.com/watch?v=1pNLnSYOycw
-
Sophie MadisonMarch 1, 2016
10 West: Project Update
The project is making good progress and remains on schedule despite recent stormy weather conditions. The North Atrium curtain wall (a weather proof outer layer of the building) has been glazed and works are progressing internally. The scaffolding will be...
-
Sophie MadisonMarch 1, 2016
4 East South: Project Update
The project has made good progress despite recent stormy weather conditions. Large segments of the West core are nearing completion which means work can now move on to the East core. Concrete works in the West core are complete. The installation of...
-
Sophie MadisonFebruary 1, 2016
10 West: Project Update
The project remains on schedule despite the winter weather conditions: Work on the building’s façade is progressing well and the installation of the final composite tiles is nearly finished. Internal works continue to make good progress with the installation of...
-
Sophie MadisonFebruary 1, 2016
4 East South: Project Update
January has seen the project move forward considerably: Large areas of the building are now boarded and plastered. Raised access flooring has been laid up to level 5 in the West section. The East exhibition space has been fully boarded, plastered...
-
Sophie MadisonJanuary 14, 2016
4 East South: Project Update
The project has made good progress during December despite a halt in construction over the Christmas period and the recent bad weather conditions: Screeding (levelled concrete flooring) has been completed on level 4. The underfloor heating system has been installed....
-
Sophie MadisonJanuary 14, 2016
10 West: Project Update
The project has made good progress and remains on schedule, despite the halt in construction over the Christmas period: Work on the façade continues on all elevations despite delays due to the recent high winds and heavy rainfall. Screeding (levelled concrete flooring) has...